Nous joindre
X
Rechercher
Publicité
 

From May 15

Lakeshore Hospital: A modular emergency awaiting major renovation

durée 06h30
15 mai 2024
ici

commentaires

ici

likes

 

vues

imprimante
Jessica Brisson
email
Par Jessica Brisson, Éditrice adjointe

On Monday, Health Minister Christian Dubé inaugurated the new modular building at the Lakeshore General Hospital in Pointe-Claire. This temporary facility houses a modern emergency room, adapted to the needs of patients and staff, while the hospital's expansion work is completed. The brand-new modular emergency department will welcome its first patients on May 15.

The new ER premises are now located on the first floor of the two-storey modular building, with a total surface area of over 3,140 m². This new, modern, standards-compliant care environment will ensure greater safety, better access and enhanced quality of care and services for the population.

In addition to the emergency department on the first floor, the modular building will house the future Groupe de médecine de famille universitaire (GMF-U) on the second floor, a joint project with McGill University.

Among other things, the future GMF-U will be able to receive and care for users presenting to the emergency department for non-urgent situations (priorities P4 and P5). In this way, they will be redirected to a resource better suited to their needs.

What's more, the modular building will house the Rapid Access Clinic (RAC) on the second floor, helping to increase fluidity within the hospital. The future GMF-U and CAR will be open to customers from May 29, 2024.

“Modernizing our healthcare facilities is one of the priorities identified in the Health Plan. Quebecers in the region, as well as our staff, deserve to benefit from facilities that meet their needs.While the Lakeshore General Hospital's new emergency project will be completed in the next few years, the modular building will allow us to offer care and services in a safe, modern and better adapted environment in the meantime,” said the Minister of Health.

The modular building will remain in place for a few years to facilitate the hospital's expansion and the construction of the new emergency department, scheduled to start in 2025.

commentairesCommentaires

0

Pour partager votre opinion vous devez être connecté.

RECOMMANDÉS POUR VOUS


Publié le 13 mars 2025

MRC de Beauharnois-Salaberry : un investissement pour l'achat local

Pour une troisième année, la MRC de Beauharnois-Salaberry annonce sa participation à l’initiative ministérielle Proximité, du ministère de l’Agriculture, des Pêcheries et de l’Alimentation de Québec (MAPAQ). Elle a lancé le projet Proximité, permettant ainsi à onze entreprises du territoire de bénéficier de formations ainsi que d'un accompagnement ...

Publié le 11 mars 2025

Access to veterinary medicines in pharmacies: obstacles persist

Pet owners sometimes face high veterinary costs, especially when it comes to purchasing medication. However, an alternative exists for owners: adding their pet to the pharmaceutical file, enabling certain prescription treatments to be obtained at reduced cost from pharmacies. However, access to these medications remains limited due to regulatory ...

Publié le 10 mars 2025

A total lunar eclipse this week in Vaudreuil-Soulanges

Astronomy enthusiasts will have a short night this Thursday, March 13, when their eyes will be turned to the sky to observe a total lunar eclipse. This will take place on Thursday night. Another eclipse, this time a partial solar one, is also scheduled for Saturday March 29 across Quebec.  Philippe Moussette, president of Club Véga in Cap-Rouge, ...

app-store-badge google-play-badge