Until this Thursday
Paving operations in Saint-Lazare this week
Town of Saint-Lazare wishes to advise its residents of paving operations on rue Duhamel between the railroad tracks and 771 rue Duhamel, as well as on the section of chemin Sainte-Angélique between route de la Cité-des-Jeunes and rue Duhamel. Work starts this Tuesday, November 14, and ends this Thursday, November 16.
No outside traffic will be allowed in these areas for the duration of the operations. Local traffic will be maintained by flagmen.
Detour roads will be set up to facilitate traffic flow. The schedule may vary according to weather conditions.
If you have any questions or concerns, please contact the Service des infrastructures at 450 424-8000, ext. 235.
RECOMMANDÉS POUR VOUS

MRC de Beauharnois-Salaberry : un investissement pour l'achat local
Pour une troisième année, la MRC de Beauharnois-Salaberry annonce sa participation à l’initiative ministérielle Proximité, du ministère de l’Agriculture, des Pêcheries et de l’Alimentation de Québec (MAPAQ). Elle a lancé le projet Proximité, permettant ainsi à onze entreprises du territoire de bénéficier de formations ainsi que ...
LIRE LA SUITE
Access to veterinary medicines in pharmacies: obstacles persist
Pet owners sometimes face high veterinary costs, especially when it comes to purchasing medication. However, an alternative exists for owners: adding their pet to the pharmaceutical file, enabling certain prescription treatments to be obtained at reduced cost from pharmacies. However, access to these medications remains limited due to regulatory ...
LIRE LA SUITE
A total lunar eclipse this week in Vaudreuil-Soulanges
Astronomy enthusiasts will have a short night this Thursday, March 13, when their eyes will be turned to the sky to observe a total lunar eclipse. This will take place on Thursday night. Another eclipse, this time a partial solar one, is also scheduled for Saturday March 29 across Quebec. Philippe Moussette, president of Club Véga in Cap-Rouge, ...
LIRE LA SUITE
