Construction work could have an impact on traffic
Start of guardrail repair work in Rigaud
The Ville de Rigaud is advising its citizens of the start of guardrail repair work on its territory, which will last until around November 15.
The order of repair sites may change depending on the nature of the work to be carried out.
The city says it is trying to keep inconvenience to a minimum during the work, but that drivers will need to cooperate and be patient if a lane is temporarily blocked.
Here are the guardrails affected by the work:
Chemin du Petit-Brûlé:
- 218 chemin du Petit-Brûlé (culvert): north side;
- 218 chemin du Petit-Brûlé (culvert): south side;
- 401 chemin du Petit-Brûlé;
Chemin de la Fourche:
- Curved section - east side;
- Curved section - west side;
Rue Saint-Antoine:
- Robert-Lionel-Séguin;
Chemin de la Sucrerie:
- 52 chemin de la Sucrerie;
Chemin Saint-Georges:
- New guardrail - north side at 74;
- New guardrail - south side at 74;
- New guardrail - north side at 67;
- New guardrail - south side at 67;
Pour partager votre opinion vous devez être connecté.