Workroads
Drilling operations in Rigaud
SNC-Lavalin has been mandated by the Ministère des Transports et de la Mobilité durable (MTMD) to conduct a geotechnical study for a culvert located in Rigaud on Chemin du Haut-de-la-Chute.
As part of the study, drilling work will be required. This will take place over the next few days, near the 141 chemin du Bas-de-la-Rivière civic address.
Work will take place between 7 a.m. and 5 p.m., on the eastbound shoulder of the road. Traffic will alternate with flagmen during the work.
In the event of adverse weather conditions or operational constraints, this work may be postponed or extended.
Any questions relating to this work can be sent by e-mail to [email protected] or by telephone to 514 701-2151.
Pour partager votre opinion vous devez être connecté.